Retrofit DCS for Gas Plant

The DCS has been installed on-site since 1988, and inrecent years it has experienced several problemswhich caused the plant to run inefficiently. As a result,an upgrade to the system is needed. Granitorupgraded the DCS control system for the gas stationusing Honeywell Experion UOC. The plant is located in an inner forest of the Aceh area.We also integrated the HMI on the field with theoperator station in Jakarta. As a result, topmanagement in Jakarta could monitor plantoperations in real time.

Scope of Works

Reverse Engineering for DCS systems; DCS panel fabrication and programming; Dismantled earlier DCS; Installation and commissioning DCS systems; Integrating HMI in the field in Jakarta using webclient services.